RECONSTRUCTION VS NEW BUILT?
Reconstruction equals cost savings?
Think again.
It is a common belief amongst owners that reconstruction will equate to construction cost savings. Now think again.
Consider a scenario where your structural beams, columns and your 2nd storey floor slab are retained. Not only will you have to retain the height of your existing first storey, any new piping works will require hacking of the original floor slab and skillful concealment.
To add an additional storey to the existing house or change a roof type may result in additional loading. It will mean reinforcement to the existing structure resulting in chunky columns and thick reinforcement beams.
When the planning is not done skillfully, you not only end up with an undesirable end product and the cost may also jack up.
Speak with us today to get our professional advice on the matter.
RELATED ARTICLES
Industry Lingo: Fire Safety & Shelter Department (FSSD)
Merged with the Central Enforcement Department (CED) in April 2020, the Fire Safety and Shelter Department (FSSD) comes under the umbrella…
Industry Lingo: Who is a Resident Technical Officer (RTO)?
The Resident Technical Officer (RTO) is a civil or structural engineering trained individual who ensures that there is…
Fire Safety Certificate (FSC) vs Temporary Fire Permit (TFP)
A Fire Safety Certificate (FSC) is required under the Fire Safety Act for all premises when a person wishes to change the design and layout…
NAVIGATE
Address
402 Orchard Road #03-10 Delfi Orchard Singapore 238876
Buildwith@swingarchitects.com
Phone
+65 94357213 | +65 88867531
All images and content may not be used without permission