INDUSTRY LINGO:
URBAN REDEVELOPMENT AUTHORITY (URA)
… When do you require URA submission for your development?
The Urban Redevelopment Authority (URA) is a statutory board under the Ministry of National Development. Planning Permission must be obtained from URA for all building projects, except minor development or works that could be exempted.
Development owners are advised to engage a qualified person (QP) to prepare the building plans for submission to the Development Control Group for the application to obtain planning permission.
Any work that involves change of use, change in quantum, increase in GFA, subdivision or works in conservation areas are required to obtain approval. The granted approval is called the Written Permission (WP).
WP will lapse two years from the day it was granted. If the development is not completed by the date stated on it. An application for extension can be made to the URA before the WP lapses.
RELATED ARTICLES
Industry Lingo: Reconstruction
Reconstruction is defined as a proposal to replace a substantial part of a landed house by construction exceeding more than 50% in any of …
Industry Lingo: Additions & Alterations (A&A)
A&A refers to Additions and Alterations. A&A works refers to minor works done to any property type, whether commercial, residential or …
Industry Lingo: Fire Safety & Shelter Department (FSSD)
Merged with the Central Enforcement Department (CED) in April 2020, the Fire Safety and Shelter Department (FSSD) comes under the umbrella…
NAVIGATE
Address
402 Orchard Road #03-10 Delfi Orchard Singapore 238876
Buildwith@swingarchitects.com
Phone
+65 94357213 | +65 88867531
All images and content may not be used without permission